02 Jun 2026 Sandhar Engineering Private Limited: CPR-Sandhar_Engineering_Private_Limited
Sandhar Engineering Private Limited: Ratings upgraded to [ICRA]A+(Stable)/[ICRA]A1 and rated amount enhanced
Sandhar Engineering Private Limited: Ratings upgraded to [ICRA]A+(Stable)/[ICRA]A1 and rated amount enhanced
Sandhar Engineering Private Limited: [ICRA]A(Stable)/[ICRA]A2+; Assigned
Sandhar Engineering Private Limited: [ICRA]A(Stable)/[ICRA]A2+; Assigned
| Long-term – Fund-based – Term Loan | -- | -- | [ICRA]A+(Stable) | -- |
| Long-term – Unallocated limits – Unallocated limits | -- | -- | [ICRA]A+(Stable) | -- |
| Long-term/Short-term – Fund-based – Others | [ICRA]A1 | -- | [ICRA]A+(Stable) | -- |
Girishkumar Kadam,Ankit Jain,Asmita Pant
07 May 2026 04:00 PMGirishkumar Kadam,Prashant Vasisht
29 Apr 2026 04:00 PM
Please log in using your registered email id to download the report.